HCP secured the contract to complete 1,200 square metres of Reinforced Earth (RE) Panels for the Haywards Interchange Project. The RE Panels were for construction of the bridge abutments. This was a project with particularly tight time frames. Production of the RE Panels was completed over a three-month period from February to April 2016. HCP met all time constraints well in advance. HCP met strict tolerances for each panel which were inspected daily by engineers before sign off on stringent quality control. The RE Panels were of a high quality. Don Ashby-Palmer, Engineering Manager at Reinforced Earth said in a site report “the precast has an excellent finish, sides are square and overall excellent work.”